Skyfort Playset Installation – Day 3 (4/1)


Day 3 was another cold day. When I got home, I immediately set out to continue progress!

I had stored the first part of the playset underneath the carport to protect it from the elements, but obviously that was not going to be possible very much longer.

You can see the first section in the background behind me as i worked on Step 2, which is building a similar section to the first one.

Carolyn actually had a party to go to, so I had all the kids with me. Luckily the youngest went to bed early, so I just had the rest of them out here with me. She took the camera though, which is why there aren’t any more pictures of the evening’s work.

Steps 3-6 involve putting the sections from the first two steps together into the base of the clubhouse. Work went pretty well and I was able to complete up through Step 6

Day 3 time: 2 hours
Total time: 5.5 hours
Mistakes made: 0
Steps completed: 2-6 (of 103)